banner1
banner2
product-57-57

Research and development of fire protection pipeline processing equipment

product-57-57

Fire protection pipe Prefabrication

product-57-57

Construction technical Consultation

product-57-57

Customers who purchase the equipment will automatically receive an exclusive distribution right for two years.

About us
BIMTechnical Consulting

Qingdao Yongcheng Automation Technology Co., Ltd.

Located in Qingdao Pilot Free Trade Zone, Qingdao Yongcheng Fire Equipment Co., Ltd. is a tech‑focused enterprise with nine‑year experience. We specialize in prefabricated fire‑protection equipment R&D, automatic machinery manufacturing, BIM digital design and fire‑engineering services. We set up a service center in Xiasha, Hangzhou in 2021 for fire pipe fabrication, BIM application and software development. Our main offerings cover intelligent fire‑equipment production, BIM plugins and prefabricated fire‑piping systems.
Driving industry digital upgrade, we build automated fire‑pipe production lines for factory‑based prefabrication. By integrating 3D modeling, MEP coordination and on‑site assembly, we resolve drawing conflicts and rework issues, providing reliable, standardized fire‑safety solutions for construction clients.

read more
hot sell
Hot Products
Slotting Machine Fully Automatic Production Line
Slotting Machine Fully Automatic Production Line

This system is a complete industrial solution designed for the high-volume manufacturing of pipes with rolled...

view more
Laser Cutting Machine With Hole Drilling And Inkjet
Laser Cutting Machine With Hole Drilling And Inkjet

Seamlessly connects multiple processes—automatic loading, precise length measurement, CNC cutting, automatic...

view more
relation

500k

Served over 500 processing clients

100+

Exported over 100 units globally

30+

Held over 30 patents for core equipment

+86 18267136851

We have the technology and industry expertise to develop solutions that can connect people and businesses. We have the technology and industry expertise to develop solutions that can connect people and businesses. We have the technology and industry expertise to develop solutions that can connect people and businesses

Contact us

Visiting our company online?

We have factory vr display, you can contact our staff to learn more about our production qualification and equipment conditions

PROCESS

Our Working Process

  • 1
    product-104-103
    Select a project

    Engineering Coordination | BIM Model Detailing & Pipeline Coordination

    We build complete 3D BIM models based on original drawings. Clash detection and clearance optimization avoid pipeline conflicts. Modular pipe segmentation generates compliant drawings and material lists to cut on‑site rework.

  • 2
    product-104-103
    Project Analysis

    BIM Data Modelling | Digital Detailing & Processing Data Output

    BIM parts are standardized for factory prefabrication. We export NC drawings, pipe sizes, fitting and hanger data. Unique component codes ensure accurate data transmission from BIM model to workshop fabrication.

  • 3
    product-104-103
    Deliver Sample

    Prefabricated Processing | Intelligent Factory Prefabrication

    BIM‑driven assembly‑line operations complete pipe cutting, grooving, threading and coding. Coded products pass strict QC before delivery. Integrated packaging lowers on‑site workload and construction risks.

  • 4
    product-104-103
    Project Analysis

    On‑site Installation | Prefabricated Modular Construction

    Prefabricated modules are installed on‑site via BIM code matching. No extensive field‑cutting or welding is required. Modular connection simplifies work, shortens schedules, reduces waste and boosts safety.

  • 5
    product-104-103
    Select a project

    As‑built Verification | On‑site Inspection & Delivery of As‑built BIM Model

    Field measurements check one‑to‑one consistency between installed works and the BIM model. A full digital closed‑loop from design to handover supports long‑term facility operation and maintenance.

FEATURES CASE

Latest Case

case 01

30%+ reduction in project timelines

case 02

10% material savings and 30% labor cost reduction

case 03

Pipes prefabricated, coded, and zone-packed for easy on-site assembly

Latest News